A leading hospital in Southeast Texas took on a major renovation project for their cancer center. Their aim was to take a business occupancy building owned and operated by the hospital and repurpose it to function as a CT Imaging Room. The hospital contacted Cotton Global Disaster Solutions and tasked the team with a complete demolition and renovation of the building and room before the client’s fiscal year-end. Working alongside local officials and the Texas Department of State Health Services, Cotton GDS completed all tasks on-schedule and under budget.
CASE STUDY
![Medical Facility - Commercial Interior Renovation](https://static.spacecrafted.com/ebb29334a30c4d91a8724c94d6d89937/i/c9a45b2cdae8400f85deb6d07762b93b/5/4SoifmQp45JMgBnHiBhVe/IMG_6413.jpeg)
Medical Facility Interior Renovation
TURNKEY SERVICES PROVIDED
- Installed infection control containment to keep project isolated and in negative pressure in order to allow the attached cancer center to continue operations
- Installed new electrical panels and ductwork for the new CT imaging equipment
- Replaced all millwork in the CT room and control room
- Repaired and patched all drywall, tape/float, and painted all walls in the CT room and control room
- Removed existing simulation equipment
- Installed new variable air volume (VAV) devices to cool the new space and meet air circulation standards outlined by the Texas Department of State Health Services
- Installed new CT equipment
- Performed tests of air and balance of the renovated room to confirm it was in line with adjacent rooms in the cancer center
- Refurbished existing metal lead-lined doors
- Repainted the entire renovated building and room
- Installed Unistrut above ceiling supports
- Consistently maintained open communication with all project team members, including client, staff, facilities engineering, architects, engineers, physicists, and subcontractors
![Medical Facility Interior Renovation Medical Facility Interior Renovation](https://static.spacecrafted.com/ebb29334a30c4d91a8724c94d6d89937/i/abb131d325d9498bb0f9ea9c6c0b32fc/5/4SoifmQpDrHbZJ6Vx7NT6/IMG_3596.jpeg)
![Medical Facility Interior Renovation](https://static.spacecrafted.com/ebb29334a30c4d91a8724c94d6d89937/i/c7ec16d0a0844c5a9affbbd764f67794/5/4SoifmQpDrHbZJ6Vx7NT6/IMG_3600-1.jpeg)
![Medical Facility Interior Renovation](https://static.spacecrafted.com/ebb29334a30c4d91a8724c94d6d89937/i/f4e1db6ea39b4cd482b7128ae2834dcc/5/4SoifmQpDrHbZJ6Vx7NT6/Cath%20lab%202-1.jpeg)
![Medical Facility Interior Renovation](https://static.spacecrafted.com/ebb29334a30c4d91a8724c94d6d89937/i/c81f6ef8481944508452b161ac6dda4f/5/4SoifmQpDrHbZJ6Vx7NT6/IMG_5214.jpeg)
The Cotton Difference
ZERO SAFETY VIOLATIONS throughout project
Project completed UNDER BUDGET AND ON-SCHEDULE
CLIENT SAVED $55,000 by working with Cotton
RENOVATIONS WERE FINISHED IMMEDIATELY after receiving Certification of Completion
![Medical Facility Interior Renovation](https://static.spacecrafted.com/ebb29334a30c4d91a8724c94d6d89937/i/c4cbdad887dc437f89a5bb06fc820c4d/5/4SoifmQpDrHbZJ6VybMjS/Screen%20Shot%202021-03-29%20at%2012.37.54%20PM.png)
Medical Facility Case Study
A leading hospital in Southeast Texas took on a major renovation project for their cancer center. Working alongside local officials and the Texas Department of State Health Services, Cotton GDS completed all tasks on-schedule and under budget.